SHENGLONG PREFABRICATED POWER SOLUTIONS
YZC Prefabricated Cabin
A factory-integrated electrical cabin for power distribution, transformation, protection, control, and auxiliary systems.
Shenglong YZC combines a steel container-type enclosure with project-selected HV/LV switchgear, transformers, secondary equipment, and environmental controls. Factory integration allows cabin manufacture and equipment installation to proceed alongside site civil works.
Cabin dimensions, compartments, electrical ratings, and multi-cabin interfaces are configured for your project.

Product FeaturesTypical ApplicationsTechnical DataConstructionMonitoringInstallationService Conditions
Product Features
Factory Integration
The enclosure, installed equipment, primary and secondary wiring, and auxiliary systems are integrated and inspected in the factory. Site work focuses on positioning, external connections, acceptance testing, and commissioning.
Modular Project Layout
Dimensions, compartment division, doors, cable routes, and equipment access are customised. Multiple cabins can be combined for phased expansion or functional separation.
Outdoor Enclosure
IP56 enclosure protection and IK10 impact resistance support outdoor installations, with seals, corrosion treatment, and ventilation interfaces selected for the site.
Insulated Construction
Composite wall and roof panels combine an outer steel sheet, insulation, and internal finish. HVAC and heating are sized for equipment heat loss, local climate, and the required internal conditions.
Transport and Lifting
A welded base frame and designated roof lifting points support integral handling. Transport dimensions, mass, route restrictions, and the site lifting plan are coordinated during engineering.
Integrated Auxiliary Systems
Lighting, service sockets, earthing, communication, environmental controls, and optional fire detection, suppression, and security are arranged within the selected scope.
Typical Applications
Renewable Energy and Storage
Distribution and secondary-equipment cabins for wind, photovoltaic, and energy-storage installations.
Grid and Substation Projects
Switching/distribution cabins and secondary-equipment cabins. Secondary cabins may serve substations up to 110 kV; this does not establish a 110 kV primary equipment rating for the cabin.
Industry and Remote Sites
Plant and workshop distribution, mine loads, and oil/gas field supplies, with equipment selected for the site environment.
Data Centres and Infrastructure
Medium-voltage incoming and distribution equipment for data centres, computing parks, transport facilities, and municipal infrastructure.
Temporary and Emergency Supply
Suitable project configurations for construction, events, emergency deployment, or relocation.
Replicated and Phased Projects
Standardised factory integration and multi-cabin arrangements where reduced site work or staged expansion is required.
Cabin Technical Specifications
| Parameter | Specification |
|---|---|
| Enclosure protection | IP56 |
| Mechanical impact resistance | IK10; 20 J impact test |
| Roof distributed load | 2500 N/m²; test load 10010 N/m² |
| Door fire performance | 3-hour fire integrity for the corresponding tested door construction |
| Panel thermal conductivity | 0.0414 W/(m·K), reported test data |
| Neutral salt-spray test | 1440 hours for the corresponding tested construction |
| Corrosion environment verification | C5-M; 720-hour condensation test |
| Damp-heat cyclic test | 55°C; 12 h + 12 h cycles × 6 |
| Seismic verification | Intensity 9 under YD 5083-2005 for the corresponding tested construction |
| Integral lifting test | 1.25 × maximum transport mass using roof lifting points |
| Cabin size | Length × width × height according to the ordered configuration |
| Electrical ratings | Voltage, frequency, capacity, fault duty, and protection specified for the installed equipment; catalogue reference frequency 50 Hz |
Performance scope: Structural and environmental results apply to the corresponding tested construction. Door fire integrity does not establish a 3-hour fire rating for the entire cabin. Thermal conductivity and insulation performance are supported by reported data and coordinated with the complete thermal design.
Construction and Functional Configuration
High-Voltage Distribution
Project-selected switchgear for 6/10 kV or 35 kV systems, with circuit arrangement, insulation, fault duty, and operating clearances determined by the installed equipment.
Transformer Equipment
Dry-type or oil-immersed transformers selected by capacity and scheme. Oil-immersed equipment requires coordinated oil containment and collection.
Low-Voltage Distribution
LV panels, feeders, metering, protection, and control functions matched to the load and transformer interfaces.
Secondary and Communication Equipment
Relay panels, communication cabinets, UPS, and monitoring equipment arranged in dedicated spaces where required.
Cabin Structure and Access
The cabin uses a welded steel frame, corrugated steel outer walls, insulation, and internal finish. Gable or mono-pitch roofing provides drainage; flooring can use anti-slip checkered steel or a selected anti-static arrangement.
Doors, maintenance openings, emergency escape routes, and internal walkways follow the equipment layout and project safety requirements. Fire stopping is coordinated at compartment boundaries and cable entries.
Multi-Cabin Combinations
Primary, secondary, and communication cabins can be combined with planned transport sections, sealed joints, electrical and fibre interfaces, and a common earthing system. Delivery sequence and site assembly interfaces are defined during design.
Environmental Control and Monitoring
Temperature and Humidity
Industrial air-conditioning or selected ventilation/heating maintains the operating environment required by the equipment. HVAC capacity is based on cabin dimensions, equipment heat loss, and local climate.
Monitoring and Alarms
Selected temperature/humidity, HVAC status, smoke, door, and optional water-ingress signals can be integrated into the station monitoring system.
Fire Protection and Security
Smoke/heat detection, portable or automatic extinguishing, access control, and video surveillance are optional and selected to meet the project requirements.
Earthing and Cable Routing
A continuous earth busbar bonds the steel structure, equipment enclosures, doors, and relevant embedded parts to the station earth grid. Lightning protection follows the station design.
HV/LV cables and fibre enter through coordinated foundation ducts or trenches. Power and signal routes are separated, with fire-stop and weather-sealing interfaces specified for each opening.
Installation and Foundation
| Parameter | Specification |
|---|---|
| Foundation type | Reinforced-concrete strip footing or raft, designed for soil conditions and loads |
| Height above grade | Typically 300–500 mm, subject to local flood requirements |
| Embedded fixing | Plates or anchor bolts located to the base-frame fixing pattern |
| Cable routes | Reserved openings or trenches with drainage and coordinated supports |
| Oil containment | Required where oil-immersed equipment is installed; volume and collection arrangements follow the project design |
| Access | Clear door-opening, maintenance, evacuation, and HVAC service space |
The foundation illustration is schematic. Dimensions, structural reinforcement, loads, fixings, frost depth, and openings follow the approved project construction and manufacturer interface drawings.
Installation includes foundation acceptance, delivery inspection, lifting via designated points, levelling and fixing, external cable/fibre connections, sealing, earthing, and acceptance testing before energisation.
Quality Assurance and Technical Support
Relevant engineering and verification references include GB/T 17467-2020, GB/T 7251.1-2013, GB/T 4208-2017, GB/T 20138-2006, GB/T 9978.1-2008, and YD 5083-2005. Applicable standards and editions are confirmed for the project and installed equipment.
Applicable enclosure, mechanical, lifting, corrosion, door fire-integrity, and seismic test documentation is available for project review. Thermal conductivity and insulation performance are presented as measured data rather than a blanket conformity claim.
Product documents include the certificate of conformity, routine test report, operating manual, installation drawing, primary/secondary diagrams, and packing list according to the agreed supply scope.
Service Conditions
| Parameter | Specification |
|---|---|
| Installation | Outdoor |
| Typical ambient temperature | −25°C to +45°C; actual range specified at ordering |
| Internal equipment environment | Maintained by the selected temperature-control system |
| Normal service altitude | Up to 1000 m; higher altitudes reviewed separately |
| Relative humidity | Daily mean ≤95%; monthly mean ≤90% |
| Site environment | No fire/explosion hazards, severe pollution, or chemical corrosion under normal service conditions |
| Special conditions | Cold, salt spray, sand/dust, high humidity, and unusual heat loads addressed in the project design |
State the required internal temperature range, actual altitude, corrosion exposure, and transport conditions so that insulation, HVAC, protective treatment, and installed equipment ratings can be coordinated.
Discuss Your YZC Prefabricated Cabin Project
Send the single-line diagram, equipment schedule, and site layout. Please include:
- Cabin dimensions, quantity, compartments, door positions, and delivery schedule.
- HV/LV voltages, transformer capacity, incoming/outgoing circuits, and protection.
- Switchgear, relay, communication, UPS, and auxiliary equipment requirements.
- Site temperature, altitude, humidity, dust, salt spray, and corrosion class.
- Internal temperature targets and equipment heat loads.
- Fire detection/suppression, access control, video, and monitoring interfaces.
- Foundation, cable routes, oil containment, and earthing requirements.
- Transport limits, sea freight, multi-cabin interfaces, and installation sequence.
If you are still planning your project, send the information you have. We can discuss the remaining details with you.
Prefer email? info@shenglong-hub.com
Specifications and configurations are subject to the approved project technical agreement and final manufacturer confirmation. Test results apply to the corresponding equipment, construction, and conditions.

