SHENGLONG PREFABRICATED SUBSTATIONS
YBH Hua-Type Step-Up Substation
An integrated step-up solution for wind, photovoltaic, and energy-storage projects connecting to 35 kV collector systems.
Shenglong YBH combines enclosed HV and LV compartments with an externally mounted oil-immersed transformer and exposed radiators. Factory assembly and internal wiring simplify installation and interface coordination.
We configure the transformer, switching, protection, monitoring, and site interfaces around your generation and grid-connection requirements.

Equipment PhotosProduct FeaturesTypical ApplicationsTechnical DataConstructionMonitoringInstallationService Conditions
YBH Equipment and Layout
Explore YBH enclosure arrangements, transformer installation, switchgear panels, and equipment access.

YBH Exterior Arrangement
Exterior enclosure and protective grille arrangement.

Transformer and Base Arrangement
Transformer, cooling radiators, and supporting base.

Switchgear Operating Panel
Switchgear operating panel within the enclosure.

Access and Internal Layout
Open-door view of the enclosure and equipment arrangement.
Product Features
Integrated Hua-Type Arrangement
HV and LV equipment occupy separate enclosed compartments, with the transformer mounted externally. Busbars and cables connect the functional units into a coordinated step-up system.
Exposed Transformer Radiators
Outdoor radiator surfaces support natural cooling. Additional forced-air cooling can be selected where required by transformer duty and site conditions.
Outdoor Enclosure Protection
IP54 enclosure protection, IK10 impact resistance, and EPDM door gaskets support outdoor installations. Corrosion protection is selected for the site and transport conditions.
Accessible Transformer Indicators
Oil level, gas protection, and pressure-relief devices are externally visible for inspection. Equipment orientation and maintenance access are coordinated in the layout.
Protection and Interlocking
Protection, metering, earthing switches, surge arresters, and interlocks are selected to suit the collector-system scheme and operating requirements.
Factory Assembly and Testing
Primary and secondary connections are assembled and tested in the factory. Site work includes positioning, external connections, inspections, and commissioning.
Typical Applications
Photovoltaic Plants
Step-up connection of inverter output and collection circuits in utility-scale and suitable distributed PV projects.
Wind Farms
Turbine step-up and internal collector-system connections, with voltage combination and protection matched to the plant design.
Energy Storage Integration
PCS step-up and charge/discharge collection in PV-storage or wind-storage projects. Bidirectional duty and transformer requirements are reviewed during engineering.
Renewable Plant Auxiliary Systems
Selected auxiliary and backup supply arrangements within renewable-energy installations, configured for the required voltage and circuit duties.
Technical Specifications
| Parameter | Specification |
|---|---|
| System voltage | 35 kV |
| Maximum HV operating voltage | 40.5 kV |
| Maximum LV operating voltage | 1.14 kV; actual voltage matched to the plant system |
| Rated frequency | 50 Hz |
| Transformer capacity | 10000 kVA for the type-tested configuration; other capacities subject to project verification |
| HV connection short-time withstand | 31.5 kA for 4 s; peak 80 kA |
| Earthing circuit short-time withstand | 31.5 kA for 2 s; peak 80 kA |
| Enclosure protection | IP54 |
| Enclosure impact resistance | IK10 |
| Compartment protection | IP2X and above, according to configuration |
Configuration selection: The 10000 kVA, 40.5/1.14 kV configuration provides the stated type-test reference. Transformer capacity, actual LV voltage, cooling, protection, and fault duty are confirmed together for the proposed equipment.
Insulation Levels
| Circuit | Power-frequency withstand, 1 min | Lightning impulse withstand |
|---|---|---|
| HV circuit, phase to earth | 95 kV | 185 kV |
| HV switch open gap | 118 kV | 215 kV |
| Transformer LV side | 2.5 kV | 14.8 kV |
For high-altitude installations, insulation and temperature-rise requirements are reviewed for the actual altitude.
Construction and Equipment Arrangement

Front View
Select the image to view the original drawing.

Side View
Select the image to view the original drawing.

Top View and Component Arrangement
Select the image to view the original drawing.
Original technical drawings retain their source labels and component numbers. The illustration shows the equipment arrangement; dimensions and interfaces are confirmed in the project drawings.
High-Voltage Compartment
40.5 kV switching equipment, disconnectors, current and voltage transformers, surge arresters, and live indication are selected by scheme. Circuit-breaker or switch-fuse protection is coordinated with the transformer and collector system.
External Transformer
A three-phase, two-winding oil-immersed transformer uses ONAN cooling and off-circuit tap changing. Vector group, impedance, tap range, energy efficiency, and oil protection are defined for the project.
Low-Voltage Compartment
An LV air circuit breaker, selected feeder circuits, surge protection, and station-service equipment connect to the plant LV system. Actual voltage and circuit quantities are specified during design.
Enclosure and Auxiliary Equipment
A welded base provides lifting and foundation fixing interfaces. Communication equipment, lighting, temperature/humidity control, dehumidifiers, and optional UPS are arranged within the enclosure.
Cooling, Protection, and Access
Keep the radiator side unobstructed to maintain natural airflow. Compartment ventilation, internal circulation, and optional external-circulation fans are selected for the ambient conditions and installed secondary equipment.
Transformer oil-temperature monitoring can provide alarm and trip outputs. Main-switch and earthing-switch interlocks, access control, and protection settings follow the plant operating scheme. Maintenance isolation boundaries are defined in the approved operating instructions.
Earthing and Cable Interfaces
A continuous earth busbar connects the equipment enclosures, doors, and relevant foundation parts to the plant earth grid. Transformer-neutral connections follow the specified system arrangement.
35 kV collector cables enter through foundation trenches or ducts. LV cable routes, cable quantities, openings, fire stopping, and moisture sealing are coordinated with the plant design.
Intelligent Monitoring and Plant Integration
Measurements and Status
Selected HV/LV voltages and currents, transformer oil temperature, compartment temperature/humidity, switch positions, protection indications, and door status.
Alarms and Remote Control
Condensation, heating/dehumidifier, and equipment alarms, with authorised switching and auxiliary controls defined in the agreed control scheme.
Communications and Optional Systems
Plant monitoring interfaces, network switches, fibre termination, UPS, wireless temperature sensing, and video surveillance according to the selected scope.
Site Layout, Foundation, and Oil Containment
Enclosure dimensions, transformer orientation, lifting access, and cable interfaces depend on the ordered configuration. We provide project arrangement and foundation drawings for civil coordination.
| Parameter | Specification |
|---|---|
| Foundation | Reinforced-concrete base and walls designed for equipment loads and soil conditions |
| Foundation top above grade | Generally 300–500 mm, coordinated with flood-level requirements |
| Cable routes | Reserved trenches or ducts, with drainage and cable supports |
| Embedded parts | Continuous channel steel and fixing interfaces coordinated with the base |
| Oil containment | Transformer oil catch pit or connection to the station emergency oil collection system, designed for oil quantity and local requirements |
| Access and ventilation | Clear door-opening and maintenance space; unobstructed radiator airflow |
The foundation image is a schematic. Dimensions, reinforcement, openings, drainage, fire protection, and oil-containment capacity follow the approved project design.
Integral lifting uses the designated base lifting points and the supplied instructions. Protect doors, radiators, and louvres during handling, and inspect seating, fixing, and earthing after positioning.
Quality Assurance and Technical Support
Product engineering references GB/T 17467-2020, GB/T 1094.1-2013, GB/T 11022-2020, and GB 20052-2020. Applicable editions and transformer efficiency requirements are agreed for the proposed equipment.
Type-test documentation is available for the corresponding YBH configuration, including insulation, short-time withstand, enclosure protection, impact resistance, temperature rise, functional performance, and earthing continuity.
Product certificates, factory inspection reports, operating instructions, primary/secondary wiring diagrams, and packing information are supplied according to the agreed scope.
Service Conditions
| Parameter | Specification |
|---|---|
| Installation | Outdoor |
| Normal ambient temperature | −25°C to +40°C |
| Cold-region design | Lower temperatures by specific agreement |
| Normal service altitude | Up to 1000 m |
| Relative humidity | Daily average ≤95%; monthly average ≤90% |
| Environment | Free from fire/explosion hazards, heavy pollution, and chemical corrosion |
| Seismic conditions | Foundation and fixing designed for local requirements |
For higher altitude, sand, salt fog, wide temperature ranges, or hot-humid sites, state the actual conditions during enquiry. We review external insulation, thermal margins, filtration, dehumidification, corrosion protection, and transport packing.
Discuss Your YBH Step-Up Substation Project
Send your single-line diagram and plant layout. Please include:
- Transformer capacity, voltage combination, quantity, and delivery schedule.
- Vector group, impedance, tap range, and energy-efficiency requirements.
- HV circuit arrangement, protection, metering, and grid-connection requirements.
- LV voltage, main switching, feeder circuits, and station-service scheme.
- Cable entry/exit, cable sizes, and circuit quantities.
- Altitude, ambient temperatures, sand, salt fog, humidity, and corrosion class.
- Cooling, oil containment, fire protection, and maintenance access.
- Monitoring, communications, UPS, video, and other auxiliary functions.
- Sea transport, packaging, colour, marking, and spare parts.
If you are still planning your project, send the information you have. We can discuss the remaining details with you.
Prefer email? info@shenglong-hub.com
Specifications and configurations are subject to the approved project technical agreement and final manufacturer confirmation. Test documentation applies to the respective tested equipment and conditions.